Our company realizes the rehabilitation works of the turbine, generator and electrical equipment of 100 kW - 150 MW hydroelectric power plants by the specialist team.
GÖKÇEKAYA HEPP 3 x 92,8 MW (EÜAÞ):
Renewal, erection and after the erection balance vibration adjustments of the rotor poles and renewal, erection, tets of the existing stator windings (3 units) were realized.
Also production and erection of the generator brake ring and water inlet nozzle head covers were realized by TEMSAN personnel.
DEMÝRKÖPRÜ HEPP
3 x 23 MW (EÜAÞ)
Renewal, erection and tets of the existing 3 units of stator windings were realized and handed over in working order.
ÝKÝZDERE HEPP 3 x 5,04 MW (EÜAÞ)
Turbine head cover labyrinth, draft tube labyrinth and wicket gate production were completed and handed over.
BEYKÖY HEPP 3 x 5 MW (EÜAÞ)
Water inlet nozzle grill cleaning system production was completed and handed over in working order.
MANAVGAT HEPP 2 x 24 MW (EÜAÞ)
Production of water inlet nozzle grill cleaning system was completed.
KESÝKKÖPRÜ HEPP 2 x 38 MW (EÜAÞ)
Rehabilitation works of the existing rotor pole were performed.
KOVADA HEPP 3 x 2,75 MW (EÜAÞ)
Production and erection of Pelton type of turbine runner were realized.
DOÐANKENT B HEPP 4 x 8,20 + 1 x 39 MW (EÜAÞ)
Production and erection of 39 MW Francis type of turbine runner were realized.
SARIYAR HEPP 42 x 40 MW (EÜAÞ)
Production and erection of 40 MW Francis type of turbine runner were realized.
GEZENDE HEPP 3 53,10 MW (EÜAÞ)
Design, production and erection of butterfly vane (inlet vane) with diameter of 5000 m and weight of 95 tons were realized.